| ALTERNATIVE TO PIERS: Portable outriggers are an acceptable alternative to piers. |
|
.JPG) |
| ALTERNATIVE TO DIAGONAL TIES: Pan system is an acceptable alternative to diagonal ties, but vertical ties must be used in the installation. |
|
.JPG) |
| PROPERLY CONNECTED GROUND WIRE: An example of properly connecting the ground wire from A to B half. |
|
 |
| PROPER SPLICE: An example of how to properly splice a strap. |
|
 |
| PROPER PIER CONSTRUCTION: An example of proper pier construction. |
|
 |
| IMPROPER INSTALLATION OF ANCHOR HEAD: An example of an improper installation because the anchor head is not flush to the ground. |
|
 |
| IMPROPER INSTALLATION OF ANCHOR HEAD: An example of an improper installation because the anchor is not aligned with the diagonal tie. |
|
.JPG) |
| IMPROPER
INSTALLATION OF DIAGONAL TIE: An example of an improper installation because diagonal tie runs from the bottom
of the I-beam. |
|
.JPG) |
| IMPROPER CONNECTION OF GROUND WIRE: An example of improperly failing to connect the ground wire from A to B half. |
|
 |
| IMPROPER
INSTALLATION OF GROUND WIRE: An
example of an improper installation because the ground wire
has not been installed
by the manufacturer. |
|
 |
| IMPROPER PLACEMENT OF PERMIT STICKER: An example of improper placement of an installation permit sticker. |
|
 |
| IMPROPER SITE PREPARATION: An example of improper site preparation. |
|
 |
| IMPROPER STRAP: An example of an improper installation because the strap is not securely fastened. |
|
| NO ANCHOR AT VERTICAL BRACKET: An example of an improper installation because an anchor is missing at a vertical bracket. |
|
| NO DIAGONAL TIE AT VERTICAL BRACKET: An example of an improper installation because a diagonal tie is missing at a vertical bracket. |
|
.JPG) |
| NO PERIMETER PIERS AT EXTERIOR DOOR: An example of an improper installation because there are no perimeter piers at an exterior door. |
|
.JPG) |
| IMPROPER PIERS: An example of an improper installation because piers are not properly capped. |
|
 |
| NOT ENOUGH WRAPS ON SPLIT BOLT: An example of improper installation because there are not enough wraps on the split bolt. |
|
 |
| SHIPPING MATERIALS LEFT ON ROOF:An example of an improper installation because shipping materials have not been removed. |
|
 |
| SHIPPING MATERIALS LEFT ON ROOF: An example of an improper installation because shipping materials have not been removed from roof. |
|
.JPG) |
| SPLIT BOLT NOT CORRECT: An example of an improper installation because split bolt is not correct on the anchor head. |
|
 |
| WEDGES ARE NOT PROPERLY INSTALLED: An example of an improper installation because wedges are not properly installed. |
|
 |